The Bishkek CHP plant is operating normally.

As of November 5 of the current year, the average electric capacity is 366 MW.

Daily fuel consumption: coal – 6,086 tons; gas – 234 thousand m³.

The CHP plant has a total of 15 boiler units, 7 turbo units with cross-connections, and 2 power units (Nos. 3 and 4).

Current status:

In operation: 6 boiler units, 4 turbo units, units No. 3 and 4

Under maintenance: 4 boiler units, 1 turbo unit

In reserve: 5 boiler units, 2 turbo units

To prepare for the 2025/2026 autumn-winter period for electricity and heat supply, the CHP plant plans to receive 1,400,000 tons of coal. The coal delivery schedule is planned until the end of the heating season.

The coal stock at the CHP warehouse as of November 5, 2025, is 313,203 tons.