In the Pervomaisky District, road repair work continues on Kedeykan Street, from Mesarosha Street to Naberezhnaya Street.

A team from the municipal enterprise “BishkekAsphaltService” has carried out the removal of the old asphalt. Surface leveling with a grader and compaction with a vibratory roller are also underway.

Currently, the team is preparing the road base layer by layer. After this, more than 50 manholes are planned to be raised to the level of the new pavement.