The Capital Construction Department of the Bishkek City Hall has completed 95% of the overhaul of the gym in the Ak-Orgo residential area. The area of the hall is 216 square meters.
To date, work has been completed on installing a roof and insulating the ceiling, repairing internal walls, installing a boiler, a bathroom and shower, laying a sewer system, and finishing the façade of a building made of composite material.
In addition, landscaping has been carried out.
The contractor was Orbital Stroy Limited Liability Company.
Let us remind you that this building was previously an abandoned boiler house. In order to develop the infrastructure of residential areas and attract young people to sports, a major renovation of the sports hall was carried out.