The Lebedinovka MTU has prepared a project for the construction of a 750-bed school with a total area of 8,705.16 m2.

Due to the lack of a school in the Birimdik-Kut residential area, as well as in the Aikol residential area, parents of preschool and school-age children are forced to take them to schools in Bishkek and Lebedinovka village.

The large amount of transportation costs and the time spent by parents on transporting children are causing discontent among residents, and demands are being made to speed up the construction of a school building.

With the resolution of the issue of building a school in the Birimdik-Kut residential area, it will be possible to equip students in the Aikol residential area, as well as unload schools in the villages of Vostok and Dachnoye.

The projected comprehensive school for 750 students consists of three-storey educational blocks "A" and "B".


To date, the school's design and estimate documentation has been fully prepared and this school will be built under the "Construction of Public Schools (Phase II)" project, funded by the Saudi Development Fund. The start of the project is 2026, the construction period is 2 years.