At the intersection of Malikov and Alybayev streets, a leak was found on the cold water supply networks.
The water supply service of the PES "Bishkekvodokanal" has started to eliminate the accident.
It should be noted that during frosts, the ground freezes by a meter, which significantly increases the number of breakthroughs on water supply networks and complicates the work process itself.
It took several hours to eliminate the accident, as the workers worked in difficult conditions.
Even the overalls of the water utilities did not help in such a cold. Replacing each other, the specialists caulked the joint of a water pipe with a diameter of 300 mm.