Snow from the carriageway of city roads will be removed by 35 units of special vehicles, including 25 snowplows based on MAZ, 2 units of sand-throwing machines based on ZIL, 2 front loaders, 5 Belarus tractors with brushes and shovels, 2 tractors with a snowplow, 4 universal machines and 40 employees of the road maintenance department of the DEU.
Snow removal from stops and sidewalks along roads will be carried out by 615 workers for the current maintenance of roads and 121 loaders with manual loading on dump trucks.
6000 tons of salt and 3000 tons of washed sand have been harvested for the winter season. At the same time, sand will be used as a last resort.